Photo Design and construction of pipelines crossing obstacles such as rivers or other HDD tolls
The HDD process begins by drilling a small, horizontal hole (pilot hole) under a passing barrier (eg, highway) with continuous strands of steel drill rod. When the head of the hole and the rod protrude from the other side of the passage barrier, a special drill called a scraper is attached to the head of the steel rod and pulled back through the pilot hole.