Entries by f@skian@2020

Hdd operation methods

Drilling operations are performed on both sides of the river called Rig Side and Pipe Side, such as drilling rig, power pack system, power generator, drilling mud construction and pumping system, and storage and control ponds for cabin or control room and a set Drilling rods (pipes approximately 9.5 meters long that are threaded on […]