The transmission line of Ghadir water supply project was inaugurated
The 1,300 mm transmission line of the “Ghadir Water Supply” project to Shadegan city has been implemented by Khatam Al-Anbia Camp for 24 months. They are covered. The number of villages covered by this project is 190 and the amount of water supply from Ghadir project is 135,000 cubic meters per day.
Leave a Reply
Want to join the discussion?Feel free to contribute!